“it’s going to help the downtown attract conferences. the fact that we’re connected to the downtown is very important for outside visitors.”
the airport trip requires a transfer at south keys because the two stations on line 4 at the airport and the uplands station at the ey centre are too small to accommodate the 80-metre stadler trains. but that isn’t a major inconvenience for travellers with overnight carry-on luggage, laroche said.
other goodies for travellers include enclosed, heated waiting areas at each station, washrooms at bayview and limebank stations, new motion-activated public art installations at corso italia, south keys and limebank stations, and eight kilometres of new multi-use pathways that mean every station will be connected to active transportation routes.
the airport station at the end of line 4 has a hallway connecting the station directly inside the airport.
julie oliver
/
postmedia
park and rides are available at leitrim and bowesville stations.
oc transpo is planning a soft launch for the service, beginning jan. 6 with monday-to-friday service. after a minimum of two weeks, service will be expanded to saturdays for at least another two weeks before full seven-days-a-week service begins.
amilcar said she expects the trillium line will be popular with users.
“people will come,” she said. “people will be very excited to take the train, so i think we’re going to maximize our capacity, which is approximately 4,000 people per hour. i think we’ll reach that for sure.”
the airport station at the end of line 4.
julie oliver
/
postmedia